HOW IT WORKS?

Using the Mustang & Pony Tile Levelling System is easy. Watch this demonstration video to see just how practical the process is – as you can see, superb results in no time!

INSTALL IN 3 EASY STEPS

Use the Mustang & Pony tile levelling system in 3 easy steps. Combining the base clips, wedges and applicator tool makes it easy to install your tiles efficiently, with perfectly level results.

1

 2

 3

Base Instruction Drawing

SETTING THE BASE CLIPS

  • Insert the base clips underneath the exposed edges of the tiles.
  • Dependant on tile size, set one or more base clips on each side of the tile.
  • Place the adjacent tile into place on top of the recently placed clips.
  • Set the tile down and lightly beat it into place with a rubber mallet.
Wedge Instruction Drawing

INSERTING THE WEDGES

  • Insert the narrow end of the wedge into the clip.
  • The wedge will click into place and secure itself onto the ridges along the top face.
  • The wedge and base clip should now be in place.
Tool Instruction Drawing

USING THE APPLICATION TOOL

  • You can now level the tile using the application tool.
  • Adjust the amount of torque pressure on the front and top of the application tool.
  • Place the tool over the wedge and base clip as shown in the diagram above.
  • Apply pressure to tighten the wedge and base clip together and level the tile.
  • Once set, remove the clips and wedges with a rubber mallet or by kicking them out with your feet.


The images and video above should allow you to get to grips with the Mustang & Pony Levelling System but if you still require guidance on how to use the system, please feel free to contact us here


 

 

Download

Download our Mustang & Pony product information by clicking on the brochure image below.